Mobile air handling units for the Olympic Games in Paris
Before the Olympic Games in Paris, our company received an inquiry, that turned out to be an interesting challenge for our design department. The customer requested 52 identical and fully customized mobile air handling units, which needed to be produced and delivered within 3 months. Main project demands were as follows:
- strict limitation of dimensions, allowing for three units to be placed and transported in a standard truck
- reinforced housing and special lifting ears for safe lifting and transportation
- units must be stackable and equipped with special limiters for safe positioning of units
- custom housing color (red)
- integrated water connection
- customized manuals for transportation, installation, and maintenance in French language
- FAT test in the factory before delivery

We are proud to have been able to fulfill all demands of this technically and logistically demanding project. The units were intended to partly cover the ventilation needs throughout the Olympic Games in Paris 2024. After the Olympics they were used for rental purposes.